CO129-121 - Sir MacDonnell - 1867 [3-4] — Page 153

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

Consider wither Mont Tyler or Theri Lanchest & be the firms most likely to supply heavy Cast Iron piping.

His Grace's office is also of opinion that the Superintending Engineer should send home properly prepared drawings & particulars of all the iron & metal Work which will be required for the Reservoir.

Sir Wardonnell has instructed Therson to call upon Wilson for drawings & specification in order that tender may be invited in the ordinary way for the supply of the necessary Metal Work.

Under these circumstances it will not be desirable for you to take any further action in the matter until you receive instruction from this department.

Edit History

2026-05-19 17:08:40 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Consider wither Mont Tyler or Theri Lanchest & be the firms most likely to supply heavy Cast Iron piping. His Grace's office is also of opinion that the Superintending Engineer should send home properly prepared drawings & particulars of all the iron & metal Work which will be required for the Reservoir. Sir Wardonnell has instructed Therson to call upon Wilson for drawings & specification in order that tender may be invited in the ordinary way for the supply of the necessary Metal Work. Under these circumstances it will not be desirable for you to take any further action in the matter until you receive instruction from this department.
Baseline (Original)
considu wither Mont Tyler or Theri Lanchest & be the firms mat likely to supply heavy Cast Iron piping His Grace. fice is also of opinion that the Surazorheal should send home perputy prepared drawings & particulars all the vion & metal Work which will be required forthe Reservoir Sie Wardonnell has Therson hea instructed to call In Wilson for upon drawings & specification in order that tender May be invited in the ordinary way for the supply of the necessary Metal Work I on on t Under these arcumstang it will not be desirable for you to take any further action in the maiter until you receive instruction from this dept I IZE In
2026-05-19 17:08:40 · Baseline
View content

considu wither Mont

Tyler or Theri Lanchest & be the firms mat

likely to supply heavy

Cast Iron piping

His Grace.

fice is also

of

opinion that the

Surazorheal should

send home perputy prepared drawings & particulars

all

the vion & metal

Work which will

be required forthe Reservoir

Sie Wardonnell

has Therson hea

instructed to call

In Wilson for

upon

drawings & specification

in order that tender

May

be invited in

the ordinary way

for the supply of

the necessary

Metal Work

I on

on t

Under these arcumstang

it will not be desirable

for you to take

any

further action in the

maiter until you

receive instruction from this dept I IZE

In

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.